← All applied analyses Applied current-state assessment

Critical resources & supply chains

The PRC retains the current structural advantage. The decisive leverage is not universal control of ore: it is concentrated processing, refining, and qualified industrial scale across several high-consequence pathways. U.S. and allied strengths in beryllium, titanium access, specialty conversion, and emerging rare-earth magnet production narrow the gap but do not erase it.

Evidence cutoff · August 5, 2026 10 consequential pathways 40 applied observations 6 ranked actions
Current comparative call

PRC lead

High confidence
PRC leadContestedU.S. / credible-allied lead
Why this call

This is an adjudicated judgment, not an average. Acute gallium, heavy-rare-earth, graphite, tungsten, antimony, and germanium exposures carry more consequence than the number of commodities in each camp. Unknown stockpile holdings and incomplete Tier-n mapping reduce precision but do not reverse the observed midstream concentration.

Decisive PRC leverage

The bottleneck is usually after the mine.

China's current leverage is strongest in primary gallium, heavy-rare-earth compounds, refined germanium, graphite/anode material, tungsten, and downstream scale. More allied ore does not solve an unqualified processing stage.

Strongest U.S. position

Beryllium is a real integrated advantage.

The United States mines more than half of estimated world output, converts material domestically, is a net exporter, and retains defense-qualified downstream production. The weakness is concentration in one integrated producer.

Allied access matters

Titanium is dependent, not presently PRC-supplied.

The United States is 100% import reliant for titanium sponge, but Japan supplied 73% of 2025 imports through July. Credible allied access materially changes the comparative call, even though domestic sponge production is absent.

Most important unknown

The public map stops before the decisive lower tiers.

Defense demand, usable stockpile holdings, qualification status, and raw-material origin remain incomplete. GAO found country-of-origin data for fewer than 10% of suppliers behind the mapped F-35 parts in one major illumination effort.

Current advantage profile

Where the edge actually sits.

Each driver is adjudicated from consequential pathways and contrary evidence. The overall call is not a mechanical average, and a public-data gap is never converted into a zero.

CR-D1 · High confidence

Mining, resource base & accessible supply

PRC edge
PRC advantageU.S. / credible-allied advantage

The PRC leads selected upstream supply in rare earths, graphite, tungsten, and gallium byproduct recovery. The U.S. leads beryllium, while Australia, Canada, Japan, and other partners create meaningful options. Those options count only where operating output and U.S. access are demonstrated.

Contrary evidence and caveat

The PRC does not control every mineral base. U.S. beryllium and allied titanium, cobalt, rare-earth, antimony, and tungsten resources prevent an across-the-board upstream monopoly.

CR-D2 · High confidence

Processing, refining & separation

Strong PRC lead
PRC advantageU.S. / credible-allied advantage

This is the decisive driver. China produced 99% of primary low-purity gallium, 77% of refined germanium in the USGS China baseline, and the dominant shares of multiple selected mineral-processing chains. U.S. primary recovery is absent for gallium and germanium and commercial heavy-rare-earth output was not yet sustained in 2025.

Contrary evidence and caveat

Allied refiners in Belgium, Canada, Germany, Japan, Norway, and Finland reduce direct U.S. exposure in selected chains, and new U.S. rare-earth separation output is operating. Feedstock origin and spare qualified output remain incompletely mapped.

CR-D3 · Moderate confidence

Defense-qualified materials & components

PRC edge
PRC advantageU.S. / credible-allied advantage

The PRC's broad metals, magnet, battery-material, and component ecosystem creates scale and integration advantages. U.S. capabilities are stronger than the old narrative implied: qualified domestic magnets exist, commercial NdFeB manufacturing began in December 2025, and U.S. firms retain high-value gallium, germanium, tungsten, titanium, and beryllium conversion capabilities.

Contrary evidence and caveat

Public data do not reveal defense-grade output, acceptance rates, or demand coverage across most pathways. Emerging U.S. capacity is therefore credited as operating or qualified where evidenced, but not presumed sufficient.

CR-D4 · Moderate-low confidence

Supplier visibility & dependency control

Likely PRC edge
PRC advantageU.S. / credible-allied advantage

The U.S. disadvantage is directly observed: procurement records identify the prime item but usually not raw-material or component origin, and major mapping efforts still lose visibility in lower tiers. A relative PRC edge is inferred from greater vertical concentration and state influence, not from a comparable public PRC supplier map.

Contrary evidence and caveat

PRC military supply chains are opaque, so superior PRC visibility cannot be measured directly. This driver records a demonstrated U.S. weakness and a bounded comparative inference—not a symmetrical data comparison.

CR-D5 · Low confidence

Buffers, alternatives & redundancy

Inconclusive
PRC advantageU.S. / credible-allied advantage

The U.S. has allied suppliers, recycling capability, substitutes, and a National Defense Stockpile; the PRC has scale, inventories, and internal supply relationships. Public evidence cannot compare usable holdings or defense-demand coverage, so no relative leader is adjudicated.

Contrary evidence and caveat

Visible U.S. annual acquisition plans are not stockpile holdings, and nominal allied production is not reserved access. Semiconductor substitution is generally not a current answer for gallium and related materials.

CR-D6 · Moderate confidence

Demonstrated expansion & qualification execution

PRC edge
PRC advantageU.S. / credible-allied advantage

China enters expansion from a much larger operating base. U.S. execution improved in 2025: domestic NdPr output reached a record, commercial magnet manufacturing began, a domestic antimony mine restarted, and new solid-rocket-motor investment entered qualification work. Much of the remaining portfolio is still commissioning, demonstration, construction, or award activity rather than sustained accepted output.

Contrary evidence and caveat

The U.S. should receive credit for facilities actually producing, not merely for announcements. The assessment does not project a future rating from projects that have not yet delivered qualified output.

Applied causal analysis

Ten pathways drive the call.

The first cut selects consequence to priority Indo-Pacific mission functions, then traces the material through its decisive stage. It does not pretend that all 60 federal minerals are equally important or equally understood.

Applied mineral records13 / 60

Selected minerals are traced; the remainder are explicitly not yet applied.

Acute rule results13

Stage-specific observations crossed a published acute threshold.

Unknown / unscored3

Missing denominators and PRC gaps remain visible.

01 · CR-P01
NdFeB permanent magnetsHeavy-rare-earth separation and scaled magnet output
PRC leadHigh confidence

Defense functionHigh-performance motors, actuators, guidance, radar and power systems

Material setNeodymium, praseodymium, dysprosium, terbium and boron

Action priorityP1 · break leverage

  1. 01Mine
  2. 02Separate
  3. 03Metal / alloy
  4. 04Qualified magnet
Judgment

U.S. mining and light-rare-earth separation are now material capabilities, but the current chain remains exposed at heavy-rare-earth compounds and scaled magnet production. China also demonstrated coercive leverage through 2025 export controls.

What offsets it

Domestic NdPr oxide output reached 2,599 metric tons in 2025; qualified U.S. magnet production exists, and MP Materials began commercial-equipment NdFeB manufacturing in December 2025. Those are operating gains, but sufficient defense coverage is not public.

What remains unknown

Defense magnet demand, accepted output by grade, embedded magnets, and stockpile coverage are not publicly comparable.

Observation → applied rule → condition → driver effect4 observations
CR-O01 · mine

China produced 270,000 of 390,000 metric tons of estimated world rare-earth mine output.

69.2 percent
CR-M02

PRC-controlled stage share: exposed at 50%–74.9%.

exposed

Supports PRC edge

2025 estimate · high confidence

Mine share combines light and heavy rare earths and does not measure separated output.

CR-O02 · compounds and metals

U.S. net import reliance for rare-earth compounds and metals was 67%.

67 percent
CR-M04

Net import reliance: exposed at 50%–74.9%.

exposed

Supports PRC edge

2025 estimate · high confidence

Finished goods containing rare earths are not captured.

CR-O03 · heavy-rare-earth compounds and metals

U.S. net import reliance was 100%; several U.S. companies produced small quantities, but none sustained commercial-scale output.

100 percent
CR-M04

Net import reliance: acute at 75% or greater.

acute

Strongly supports PRC edge

2025 estimate · high confidence

Trade codes and output are not available for every individual heavy rare earth.

CR-O04 · NdPr oxide and magnets

MP Materials produced a record 2,599 metric tons of NdPr oxide and commenced NdFeB magnet manufacturing on commercial equipment in December 2025.

2599 metric tons NdPr oxide
CR-M06

Actual output is displayed separately from projected magnet capacity; no condition bucket applies.

operating / scaling

Mitigates but does not erase PRC edge

2025 actual · moderate-high confidence

Company filing; magnet tonnage and defense-qualified demand coverage were not disclosed.

02 · CR-P02
Samarium-cobalt magnets & cobalt superalloysRefined cobalt and qualified high-temperature material
PRC edgeModerate confidence

Defense functionHigh-temperature magnets, aircraft-engine superalloys, cutting and wear-resistant materials

Material setSamarium and cobalt

Action priorityP2 · close the gap

  1. 01Mine
  2. 02Refine
  3. 03Alloy
  4. 04Qualified input
Judgment

The United States is highly import reliant while mine supply is concentrated in Congo (Kinshasa) and China remains the leading refined-cobalt producer. Samarium was also included in China's April 2025 rare-earth controls.

What offsets it

Seventy percent of reported U.S. cobalt import sources were Norway, Finland, Canada, and Japan. That allied refinery network materially reduces direct PRC dependence, although upstream ownership and feedstock origin remain incomplete.

What remains unknown

Comparable refined-cobalt market shares, defense demand, SmCo output by grade, and usable stockpile holdings are not public.

Observation → applied rule → condition → driver effect4 observations
CR-O05 · refined cobalt supply

U.S. net import reliance for cobalt was 79%.

79 percent
CR-M04

Net import reliance: acute at 75% or greater.

acute

Supports PRC edge

2025 estimate · high confidence

Import reliance does not identify upstream ownership or defense-grade allocation.

CR-O06 · cobalt mine

Congo (Kinshasa) produced 230,000 of 310,000 metric tons; calculated country-production HHI is approximately 0.57.

0.57 HHI
CR-M03

Country production HHI: exposed at 0.40–0.599.

exposed

Shows concentrated upstream risk; not itself PRC control

2025 estimate · high confidence

Country concentration does not resolve Chinese ownership or offtake.

CR-O07 · refined cobalt imports

Norway, Finland, Canada, and Japan supplied 70% of reported U.S. cobalt imports.

70 percent of imports
CR-M20

Operating allied supply is credited as accessible where trade is observed; no condition bucket applies.

verified accessible

Mitigates direct PRC dependence

2021–2024 · high confidence

Refiners can rely on third-country feedstock and existing customers.

CR-O08 · refined cobalt

USGS identifies China as the leading refined-cobalt producer, but a comparable current share was not published in the MCS chapter.

CR-M02

Unscored when a comparable value is unavailable.

unknown

Prevents false precision

2025 / 2023 baseline · moderate confidence

No current public refined share or defense allocation.

03 · CR-P03
Gallium RF semiconductorsPrimary gallium recovery
Strong PRC leadHigh confidence

Defense functionRadar, electronic warfare, communications, high-power RF and optoelectronics

Material setGallium metal, gallium arsenide and gallium nitride

Action priorityP1 · break leverage

  1. 01Byproduct recovery
  2. 02High-purity refine
  3. 03Wafer
  4. 04RF device
Judgment

This is the clearest single pathway of PRC leverage: China produced 99% of primary low-purity gallium, the United States was 100% import reliant, and USGS reports no effective substitutes for many defense GaAs and GaN applications.

What offsets it

The United States retains one high-purity recovery/refining facility using imported feedstock and domestic compound-semiconductor capability. Demonstration funding for primary recovery has not yet become sustained output.

What remains unknown

Defense demand, inventory, feedstock origin behind allied imports, and accepted output by purity are not public.

Observation → applied rule → condition → driver effect4 observations
CR-O09 · primary low-purity gallium

China produced 900,000 of about 909,000 kilograms of estimated world primary low-purity gallium.

99 percent
CR-M02

PRC-controlled stage share: acute at 75% or greater.

acute

Decisive PRC leverage

2025 estimate · high confidence

Primary output does not equal high-purity or device output, but it is the feedstock bottleneck.

CR-O10 · primary gallium supply

The United States had no primary recovery and was 100% import reliant.

100 percent
CR-M04

Net import reliance: acute at 75% or greater.

acute

Decisive PRC leverage

2025 estimate · high confidence

Excludes gallium arsenide wafers from the reliance calculation.

CR-O11 · defense GaAs and GaN applications

USGS reports no effective substitutes for GaAs and GaN in many defense-related applications.

CR-M15

Substitute readiness: acute where no viable substitute exists.

acute

Sustains exposure

2026 publication · high confidence

Substitution is application-specific; some lower-performance uses can switch materials.

CR-O12 · high-purity recovery

One U.S. company recovered and refined high-purity gallium from imported primary metal and new scrap.

1 qualified domestic facility reported
CR-M05

Independent source count: exposed at one source.

exposed

Narrow mitigation with shared feedstock risk

2025 · high confidence

Facility output and defense allocation are not public; primary feedstock remains imported.

04 · CR-P04
Germanium optics, fiber & space substratesRefined germanium metal
PRC leadModerate-high confidence

Defense functionInfrared optics, fiber optics, space solar cells and radiation detectors

Material setGermanium metal, dioxide and tetrachloride

Action priorityP1 · break leverage

  1. 01Mine / residue
  2. 02Refine
  3. 03Optical material
  4. 04Qualified component
Judgment

China held 77% of refined output in the USGS China baseline and its U.S. export ban drove estimated U.S. germanium-metal imports down 67% in 2025. The United States has no primary refinery output.

What offsets it

Belgium, Canada, and Germany supplied 72% of combined U.S. metal and dioxide imports, and U.S. firms recycle optics, fiber waste, and substrates. Some allied output may still contain upstream Chinese feedstock.

What remains unknown

Global refinery data are limited, most producers do not report output, and defense-grade demand and inventory are not public.

Observation → applied rule → condition → driver effect4 observations
CR-O13 · refined germanium

China accounted for 77% of refined germanium in the USGS China mineral-industry baseline.

77 percent
CR-M02

PRC-controlled stage share: acute at 75% or greater.

acute

Decisive PRC leverage

2023 baseline · moderate-high confidence

Global refinery reporting is incomplete and the value is a 2023 baseline.

CR-O14 · germanium supply

U.S. net import reliance was greater than 50%.

>50 percent
CR-M04

Net import reliance: at least exposed at 50%–74.9%; exact value unavailable.

exposed

Supports PRC edge

2025 estimate · high confidence

Estimated consumption and some trade forms were unavailable.

CR-O15 · germanium metal trade

Estimated U.S. germanium-metal imports fell 67% in 2025 after China's export ban to the United States.

-67 percent year over year
CR-M06

Direct disruption evidence is displayed; no universal condition bucket applies.

observed disruption

Demonstrates exercised PRC leverage

2025 estimate · high confidence

Imports of germanium dioxide rose; metal and dioxide are not interchangeable in every use.

CR-O16 · germanium imports

Belgium, Canada, and Germany supplied 72% of combined reported U.S. germanium metal and dioxide imports.

72 percent of imports
CR-M20

Observed allied trade is credited as accessible; no condition bucket applies.

verified accessible

Material mitigation

2021–2024 · high confidence

Allied refiners can use Chinese or other foreign feedstock.

05 · CR-P05
Antimony metal & oxidePrimary metal and oxide supply
Strong PRC leadHigh confidence

Defense functionAmmunition and lead alloys, flame retardants, glass and specialty materials

Material setAntimony ore, metal and oxide

Action priorityP1 · break leverage

  1. 01Mine
  2. 02Smelt / oxide
  3. 03Defense material
  4. 04Inventory
Judgment

The United States was 91% net import reliant; China supplied 55% of reported U.S. metal and oxide imports and banned antimony exports to the United States. Russia was also a major world producer, compounding access risk.

What offsets it

Domestic mining restarted in 2025 and one U.S. company produced metal and oxide from imported feedstock. Recycling supplied 12% of apparent consumption, principally within the lead-acid battery loop.

What remains unknown

New domestic mine output is withheld, defense-grade allocation is unknown, and annual stockpile plans do not reveal usable holdings.

Observation → applied rule → condition → driver effect4 observations
CR-O17 · antimony metal and oxide

U.S. net import reliance was 91%.

91 percent
CR-M04

Net import reliance: acute at 75% or greater.

acute

Supports strong PRC edge

2025 estimate · high confidence

Secondary antimonial lead is largely a closed battery loop and not equivalent to every defense form.

CR-O18 · U.S. antimony imports

China supplied 55% of total U.S. antimony metal and oxide imports.

55 percent
CR-M02

PRC-controlled stage share: exposed at 50%–74.9%.

exposed

Supports PRC edge

2021–2024 · high confidence

Trade source does not capture transshipment or embedded antimony.

CR-O19 · mine and primary processing

A domestic mine restarted in 2025, but output was withheld; the sole reported primary metal/oxide producer used imported feedstock.

CR-M06

Actual output and feedstock are displayed separately from announced capacity; no bucket applies.

emerging / insufficiently quantified

Mitigation not yet credited as coverage

2025 · high confidence

Proprietary output prevents a supply-coverage calculation.

CR-O20 · export access and price

China banned antimony exports to the United States; the 2025 average price more than doubled to about $25 per pound.

25 dollars per pound
CR-M06

Observed disruption and price response are displayed; no universal condition bucket applies.

observed coercive leverage

Strengthens PRC call

2025 · high confidence

Price is a market-wide indicator and not a direct defense-shortage measure.

06 · CR-P06
Tungsten concentrates, APT & carbideMine and intermediate conversion
Strong PRC leadHigh confidence

Defense functionCutting tools, wear parts, high-density components, electronics and specialty alloys

Material setTungsten ore, ammonium paratungstate, metal and carbide

Action priorityP1 · break leverage

  1. 01Mine
  2. 02APT / oxide
  3. 03Powder / carbide
  4. 04Qualified part
Judgment

China produced about 79% of estimated world mine output in 2025 and imposed export controls on selected tungsten items. The United States has had no commercial mine production since 2015 and remains more than 50% import reliant.

What offsets it

Seven U.S. companies can convert concentrates, APT, oxide, or scrap into powders, carbide, and chemicals. DPA awards support projects in the United States and Canada, but project awards are not current mine output.

What remains unknown

U.S. secondary output, industry stocks, apparent consumption, defense allocation, and PRC inventory are withheld or unavailable.

Observation → applied rule → condition → driver effect4 observations
CR-O21 · tungsten mine

China produced 67,000 of 85,000 metric tons of estimated world mine output.

78.8 percent
CR-M02

PRC-controlled stage share: acute at 75% or greater.

acute

Decisive PRC leverage

2025 estimate · high confidence

Mine share does not resolve intermediate conversion or inventory.

CR-O22 · tungsten supply

U.S. net import reliance was greater than 50% and no tungsten was mined commercially.

>50 percent
CR-M04

Net import reliance: at least exposed at 50%–74.9%; exact value unavailable.

exposed

Supports PRC edge

2025 estimate · high confidence

Secondary production and consumption were withheld.

CR-O23 · mine and conversion

The United States had zero operating mines but seven companies able to convert concentrate, APT, oxide, or scrap to downstream products.

0 / 7 mines / converters
CR-M05

Source count is acute at the mine stage; downstream source independence cannot be verified from company count alone.

acute upstream / unscored downstream

Shows stage-specific weakness and strength

2025 · high confidence

Converters may share imported feedstock and are not necessarily qualified for every defense form.

CR-O24 · export controls and price

China imposed export controls on selected tungsten items and Rotterdam APT prices rose from $331 to $675 per metric ton unit during 2025.

104 percent price increase
CR-M06

Observed disruption and price response are displayed; no universal condition bucket applies.

observed leverage

Strengthens PRC call

2025 · high confidence

Price also reflects broader market conditions and is not a direct defense-shortage measure.

07 · CR-P07
Natural graphite & active anode materialSpherical purification and anode material
Strong PRC leadHigh confidence

Defense functionBattery anodes, refractories, castings, lubricants and defense-related components

Material setNatural graphite, spherical purified graphite and active anode material

Action priorityP1 · break leverage

  1. 01Mine
  2. 02Purify / sphere
  3. 03Anode material
  4. 04Qualified cell
Judgment

The United States produced no natural graphite and was 100% import reliant. China produced 82% of world natural graphite and supplied 55% of U.S. active-anode-material imports in 2025; Chinese-owned production outside China can preserve control despite geographic diversification.

What offsets it

Two U.S. companies produced spherical purified graphite and another commissioned a qualification line. Multiple domestic mines and processing plants remain in development, and Korea supplies qualified anode material.

What remains unknown

Defense battery demand, anode qualification by program, ownership-adjusted origin, and usable inventory are not publicly mapped.

Observation → applied rule → condition → driver effect4 observations
CR-O25 · natural graphite mine

USGS estimated that China produced 82% of world natural graphite output in 2025.

82 percent
CR-M02

PRC-controlled stage share: acute at 75% or greater.

acute

Decisive PRC leverage

2025 estimate · high confidence

The country table is rounded; natural graphite mine share does not measure synthetic graphite or anode qualification.

CR-O26 · natural graphite supply

The United States produced no natural graphite and was 100% import reliant.

100 percent
CR-M04

Net import reliance: acute at 75% or greater.

acute

Supports strong PRC edge

2025 estimate · high confidence

Defense-related demand is not separated from commercial consumption.

CR-O27 · active anode material imports

China supplied 55% of U.S. graphite active-anode-material imports; Indonesia supplied 31% and Korea 14%.

55 percent
CR-M02

PRC-controlled stage share: exposed at 50%–74.9%.

exposed

Supports PRC edge

2025 partial year · high confidence

Facility ownership can preserve Chinese control outside China; product grade and defense use are not isolated.

CR-O28 · spherical purified graphite

Two U.S. companies produced spherical purified graphite and another commissioned a qualification line.

2+ operating producers
CR-M06

Actual operating and qualification status is displayed; no universal condition bucket applies.

operating / scaling

Mitigates but does not establish coverage

2025 · moderate-high confidence

Output, feedstock, qualification scope, and defense demand coverage were not disclosed.

08 · CR-P08
Aerospace-grade titaniumSponge metal
Contested / allied mitigationHigh confidence

Defense functionAircraft, engines, armor, marine hardware and high-strength structures

Material setTitanium sponge, scrap, powder, ingot and alloy

Action priorityP2 · close the gap

  1. 01Mineral feed
  2. 02Sponge
  3. 03Ingot / alloy
  4. 04Qualified structure
Judgment

The United States produced no titanium sponge and was 100% import reliant, while China made about 70% of world sponge. That global asymmetry does not equal direct U.S. dependence on China: Japan supplied 73% of U.S. imports through July 2025.

What offsets it

Japan is a credible ally with operating sponge production; Saudi Arabia and Kazakhstan supplied most of the remainder. The United States retains downstream ingot, alloy, aerospace manufacturing, scrap, and emerging powder capabilities.

What remains unknown

Spare Japanese output, wartime allocation, transport, U.S. industry stocks, and qualified defense demand are not public.

Observation → applied rule → condition → driver effect4 observations
CR-O29 · titanium sponge

China produced 260,000 of 370,000 metric tons of estimated world titanium sponge.

70.3 percent
CR-M02

PRC-controlled stage share: exposed at 50%–74.9%.

exposed

Shows global PRC scale

2025 estimate · high confidence

Global share does not equal U.S. import exposure to China.

CR-O30 · titanium sponge

The United States produced no sponge and was 100% import reliant.

100 percent
CR-M04

Net import reliance: acute at 75% or greater.

acute

Shows domestic dependency

2025 estimate · high confidence

Domestic downstream capability and allied access are separate observations.

CR-O31 · titanium sponge imports

Japan supplied 73% of U.S. titanium sponge imports through July 2025.

73 percent of imports
CR-M20

Observed allied supply is credited as accessible; no condition bucket applies.

verified accessible

Materially mitigates direct PRC leverage

2025 through July · high confidence

Spare capacity, wartime allocation, and transport resilience are not public.

CR-O32 · sponge and downstream titanium

The United States had zero operating sponge facilities but retained ingot and downstream product capability dependent on imported sponge and scrap.

0 domestic sponge facilities
CR-M05

Independent source count: acute at the domestic sponge stage.

acute domestic / mitigated allied

Produces a contested rather than automatic PRC-lead call

2025 · high confidence

The number and qualification of downstream suppliers are proprietary.

09 · CR-P09
Defense-grade berylliumIntegrated mine-to-product chain
U.S. leadHigh confidence

Defense functionAerospace and defense structures, precision instruments, electronics and scientific systems

Material setBertrandite, beryllium metal, oxide and copper alloy

Action priorityP3 · protect the edge

  1. 01Mine
  2. 02Refine
  3. 03Alloy / oxide
  4. 04Qualified product
Judgment

The United States holds a genuine current advantage: it produced about 54% of estimated world mine output, converts domestic ore to metal, oxide, and master alloy, and is a net exporter. A DPA-supported domestic metal capability serves critical defense needs.

What offsets it

Recycling may supply 20% to 25% of U.S. consumption and the leading producer recovers substantial new and old alloy scrap.

What remains unknown

The advantage is concentrated in one integrated company. Facility-level redundancy, defense allocation, and recovery time are not public.

Observation → applied rule → condition → driver effect4 observations
CR-O33 · beryllium mine

The United States produced about 53.5% of estimated world beryllium mine output; China produced about 17.9%.

17.9 percent PRC share
CR-M02

PRC-controlled stage share: adequate at 10%–24.9%.

adequate

Supports U.S. lead

2025 estimate · high confidence

Mine estimates include differing ore types and assumed beryllium content.

CR-O34 · integrated beryllium supply

The United States was a net exporter and operated an integrated mine-to-metal, oxide, and master-alloy chain.

net exporter
CR-M04

Net import reliance: resilient below 10%; net exporter is stronger than the threshold.

resilient

Supports U.S. lead

2025 estimate · high confidence

Some beryl and product forms are imported; company-level concentration remains.

CR-O35 · integrated producer

One company operated the principal domestic mine, hydroxide conversion, and downstream metal/alloy chain.

1 integrated source
CR-M05

Independent source count: exposed at one source.

exposed

Identifies fragility inside the U.S. advantage

2025 · high confidence

Separate facilities exist within the company, but independent ownership and process redundancy are limited.

CR-O36 · recycling

Recycling may account for 20% to 25% of U.S. beryllium consumption.

20–25 percent of consumption
CR-M16

Qualified secondary-supply coverage is unscored without grade- and demand-specific data.

unscored

Adds resilience without inflating the rating

2025 · moderate confidence

Total quantity, grade, defense allocation, and old-versus-new scrap shares are not available.

10 · CR-P10
Solid-rocket-motor energetics & precursorsQualified sole-source ingredients
U.S. constraint · PRC unknownModerate-low confidence

Defense functionTactical and strategic missile propulsion

Material setAmmonium perchlorate and other defense-unique energetic inputs

Action priorityP2 · close the gap

  1. 01Chemical input
  2. 02Energetic
  3. 03Motor
  4. 04Accepted output
Judgment

The U.S. vulnerability is clear even though the relative PRC position is not: the latest detailed public GAO baseline found one certified U.S. ammonium-perchlorate supplier, many defense-unique ingredients, and expensive requalification when any ingredient changes.

What offsets it

A 2025 DPA award is expanding another solid-rocket-motor source and qualification capacity. FY2024-2026 funding also targets solid rocket motors and critical chemicals, but accepted output by ingredient is not public.

What remains unknown

Current PRC supplier count, qualification depth, output, inventory, and comparable disruption performance are not available publicly; no PRC advantage is assigned from the gap.

Observation → applied rule → condition → driver effect4 observations
CR-O37 · ammonium perchlorate

Public GAO evidence identified one U.S. company certified to provide the principal solid-rocket-motor propellant ingredient.

1 certified source
CR-M05

Independent source count: exposed at one source.

exposed

Demonstrates U.S. single-source risk

2017 finding, current mitigation incomplete publicly · moderate confidence

The source is older; current supplier status and alternate qualifications require controlled confirmation.

CR-O38 · energetic qualification

A typical solid-rocket-motor propellant has about 25–30 ingredients; changing an ingredient requires retest, and a documented past alternate-source qualification took about two years.

730 days, illustrative past case
CR-M09

Second-source qualification: exposed at 366–1,825 days.

exposed

Shows why nominal alternatives do not equal current supply

historical case · moderate confidence

Lead time varies by motor and ingredient; the past case is method evidence, not a universal current duration.

CR-O39 · solid rocket motor production

A January 2025 DPA award supported a new producer's energetics, casting, curing, quality assurance, assembly, and qualification work.

14.3 million dollars awarded
CR-M06

Awards and planned capacity are displayed separately from accepted output; no condition bucket applies.

active mitigation

Does not yet prove current coverage

2025 · high confidence

Accepted motor output, ingredient source diversity, and production capacity were not disclosed.

CR-O40 · energetics supply chain

No comparable public PRC supplier, qualification, inventory, or output dataset was found for this pathway.

CR-M21

Missing data is unknown, never zero and never converted into a PRC disadvantage.

unknown

Prevents unsupported relative adjudication

2026-08-05 · moderate confidence

The gap could conceal either strength or weakness.

Improve the advantage

Six actions tied to diagnosed nodes.

Lead time is an implementation attribute—not a forecasted future rating. Every action has an owner, prerequisite, and observable completion test.

CR-A0101
Recommendation

Make material provenance a contract deliverable for priority systems

DoD cannot consistently see raw-material origin, ownership, qualification, or shared lower-tier choke points, so investment is often reactive.

For the ten applied pathways, require primes to provide a governed material-stage record through the decisive tier: material/form, facility, country of origin, controlling owner, qualification status, alternate source, and affected part or function. Start with priority programs and protect proprietary data rather than demanding an indiscriminate all-supplier census.

Implementation test

PrerequisitesCommon data schema, contract clauses, data-rights and security rules, program-level prioritization

Verify successAt least 85% of declared critical dependencies mapped to material, stage, facility, ownership, country, qualification, and mission use; unmapped share remains visible.

Linked pathwaysCR-P03 · CR-P04 · CR-P05 · CR-P06 · CR-P07 · CR-P10

Expected effectHigh

FeasibilityHigh

Cost bandLow–medium

Lead time6–18 months for the first priority-system baseline

OwnerOUSD(A&S), SCRM Integration Cell, service acquisition executives and program offices

CR-A0202
Recommendation

Buy accepted midstream output—not nominal mine or plant capacity

The strongest PRC leverage sits in processing and qualification, while U.S. policy often counts awards, announcements, or ore as if they were usable defense inputs.

Use purchase commitments, price floors, and offtake agreements tied to sustained accepted lots of heavy-rare-earth compounds and magnets, high-purity gallium and germanium, tungsten intermediates, antimony metal/oxide, and qualified graphite anode material. Pay against commissioning, yield, qualification, and delivery milestones.

Implementation test

PrerequisitesValidated specification and demand signal, feedstock plan, independent source test, qualification authority

Verify successSustained accepted output from at least two independent non-PRC pathways at the required grade; nameplate capacity reported separately.

Linked pathwaysCR-P01 · CR-P02 · CR-P03 · CR-P04 · CR-P05 · CR-P06 · CR-P07 · CR-P10

Expected effectVery high

FeasibilityMedium

Cost bandHigh

Lead time18–48 months, varying by material and qualification burden

OwnerDoD MCEIP/DPA Title III, DLA Strategic Materials, DOE, service program offices

CR-A0303
Recommendation

Convert allied production into enforceable access

Nominal allied capacity can be unavailable because of existing customers, feedstock, export authority, ownership, transport, or missing defense qualification.

Negotiate defense-priority offtake and qualification arrangements around operating allied nodes: Japanese titanium sponge; Belgian, Canadian, and German germanium; Norwegian, Finnish, Canadian, and Japanese cobalt; and credible Australian, Canadian, European, and Korean mineral-processing projects. Record controlling ownership and upstream feedstock, not only facility geography.

Implementation test

PrerequisitesExport authority, allocation terms, logistics plan, common specification and qualification pathway

Verify successContracted, qualified output with auditable feedstock, priority access, transport route, and delivery performance; nominal national capacity receives no credit.

Linked pathwaysCR-P02 · CR-P04 · CR-P05 · CR-P06 · CR-P07 · CR-P08

Expected effectHigh

FeasibilityMedium–high

Cost bandMedium

Lead time12–36 months

OwnerDepartments of State and Defense, DFC, EXIM, DLA and allied ministries

CR-A0404
Recommendation

Use the stockpile as a qualification bridge at the decisive material stage

Public annual material plans do not reveal usable holdings, and stockpiling ore does not solve a shortage of defense-grade metal, chemical, magnet, powder, or energetic input.

Set classified or controlled inventory objectives against validated consumption and alternate-source lead time. Hold the processed form that can enter the production line, exercise release protocols, and reduce the buffer as qualified independent output becomes available.

Implementation test

PrerequisitesDefensible demand range, shelf-life and storage plan, specification control, release and replenishment authority

Verify successCoverage is calculated from usable material and validated demand; release exercises prove delivery to an accepting production line.

Linked pathwaysCR-P01 · CR-P02 · CR-P03 · CR-P04 · CR-P05 · CR-P06 · CR-P08 · CR-P09 · CR-P10

Expected effectHigh

FeasibilityHigh

Cost bandMedium–high

Lead time6–24 months for acquisition and release validation

OwnerDLA Strategic Materials, service sustainment commands and program offices

CR-A0505
Recommendation

Fund qualification and closed-loop recovery together

Recycling or substitution is often counted at laboratory or gross-tonnage level even when recovered material cannot meet the original defense specification.

Pair recycling and substitution projects with representative parts, acceptance criteria, production yield, retained feedstock, and a named qualification authority. Prioritize magnet scrap, germanium optics and wafers, cobalt and tungsten scrap, graphite anodes, and titanium scrap/powder where current industrial capability exists.

Implementation test

PrerequisitesFeedstock capture, chain-of-custody, specification, representative test article and acceptance authority

Verify successRepeated accepted lots at declared yield and scale; recycled or substitute output is credited only against the demand it can actually meet.

Linked pathwaysCR-P01 · CR-P02 · CR-P03 · CR-P04 · CR-P07 · CR-P08 · CR-P09

Expected effectMedium–high

FeasibilityMedium

Cost bandMedium

Lead time12–36 months for selected pathways

OwnerDoD laboratories and program offices, DLA, DOE and qualified manufacturers

CR-A0606
Recommendation

Protect existing U.S. strengths from becoming new single points of failure

Beryllium, tungsten conversion, emerging magnet production, titanium downstream processing, and solid-rocket-motor skills are valuable but concentrated.

Maintain warm equipment and skilled workforces, qualify independent backup processes where economics permit, pre-negotiate surge inputs, and monitor common utilities and sub-tier chemicals. Preserve the integrated beryllium chain while adding recovery and alternate-process resilience rather than fragmenting its current advantage.

Implementation test

PrerequisitesFacility-level dependency map, workforce and equipment baseline, qualification plan, stable demand

Verify successCritical processes have tested continuity plans and either an independent qualified source or a funded, exercised recovery path with defined acceptance criteria.

Linked pathwaysCR-P01 · CR-P06 · CR-P08 · CR-P09 · CR-P10

Expected effectMedium–high

FeasibilityHigh

Cost bandMedium

Lead time12–30 months for initial redundancy and continuity plans

OwnerDoD Industrial Base Policy, DPA Title III, service acquisition and sustainment organizations

Analytical audit trail

The machinery is available—but subordinate.

The findings come first. Open this section to inspect the prioritization trace, metric contracts, full federal universe, evidence limitations, and source records.

Methods & evidenceInspect how the current judgment was reached
Scope rule

Current evidence only.

Current U.S. and credibly accessible allied position compared with the PRC. A high-end Indo-Pacific contingency is used only to select consequential pathways, not to forecast future ratings.

Projects, awards, and announced capacity appear as mitigations or action options. They do not change the current comparative rating until sustained accepted output is observed.

Federal list → applied set

13 minerals traced into the ten pathways.

P1

Break leverage

A current exposed or acute required stage gives the PRC coercive leverage and no publicly demonstrated mitigation is sufficient today.

P2

Close the gap

A direct defense dependency is materially exposed, but operating allied access, domestic capability, or a bounded substitute reduces current PRC leverage.

P3

Protect the edge

The U.S. or credible allies hold the current advantage, but concentration or a weak backup path could erode it.

Not yet applied

Retained in the federal universe but outside this consequence-selected first cut; never labeled unimportant or safe by omission.

P1 break leverage

Antimony

ammunition alloys · flame retardants · specialty materials

direct defense use + acute import reliance + PRC export ban + no quantified domestic coverage
P3 protect edge

Beryllium

aerospace defense structures · precision instruments · electronics

direct defense use + integrated US chain + net exporter + single integrated source fragility
P2 close gap

Cobalt

aircraft engine superalloys · SmCo magnets · cutting tools

direct defense use + acute US import reliance + concentrated mine supply + allied refinery mitigation
P1 break leverage

Dysprosium

high temperature NdFeB magnets for motors actuators guidance and radar

indispensable high performance magnet use + acute heavy RE import reliance + no sustained US commercial scale output
P1 break leverage

Gallium

GaAs GaN radar · electronic warfare · communications · high power RF

indispensable defense semiconductor use + 99pct PRC primary output + 100pct US import reliance + no effective substitute
P1 break leverage

Germanium

infrared optics · fiber optics · space solar cells · radiation detectors

direct defense use + acute PRC refining share + observed export disruption + allied refinery mitigation
P1 break leverage

Graphite

battery anodes · refractories · castings · defense related components

direct defense use + 82pct PRC mine share + 100pct US import reliance + PRC anode material concentration
P1 break leverage

Neodymium

NdFeB magnets for motors actuators guidance radar and power

indispensable permanent magnet use + exposed import reliance + domestic output not yet proven sufficient
P1 break leverage

Praseodymium

NdFeB magnets for motors actuators guidance radar and power

indispensable permanent magnet use + exposed import reliance + domestic output not yet proven sufficient
P2 close gap

Samarium

SmCo high temperature magnets

direct high temperature magnet use + PRC export control + allied cobalt refinery mitigation + output gap
P1 break leverage

Terbium

high temperature NdFeB magnets for motors actuators guidance and radar

indispensable high performance magnet use + 100pct reported China import source + no sustained US commercial scale output
P2 close gap

Titanium

aircraft · engines · armor · marine hardware · high strength structures

direct defense use + 100pct US import reliance + credible Japanese access + strong US downstream chain
P1 break leverage

Tungsten

cutting tools · wear parts · high density components · electronics · specialty alloys

direct defense use + acute PRC mine share + no US mine + PRC export controls + US conversion mitigation
Inspect the complete 60-mineral federal universe
AluminumAntimony · appliedArsenicBariteBeryllium · appliedBismuthBoronCeriumCesiumChromiumCobalt · appliedCopperDysprosium · appliedErbiumEuropiumFluorsparGadoliniumGallium · appliedGermanium · appliedGraphite · appliedHafniumHolmiumIndiumIridiumLanthanumLeadLithiumLutetiumMagnesiumManganeseMetallurgical coalNeodymium · appliedNickelNiobiumPalladiumPhosphatePlatinumPotashPraseodymium · appliedRheniumRhodiumRubidiumRutheniumSamarium · appliedScandiumSiliconSilverTantalumTelluriumTerbium · appliedThuliumTinTitanium · appliedTungsten · appliedUraniumVanadiumYtterbiumYttriumZincZirconium
Metric contracts

21 published rules; 40 applied observations.

Each observation preserves the raw fact, rule, bucket, relative effect, source, date, confidence, and limitation. Supply-coverage and inventory rules remain unscored where public denominators do not exist.

CR-M01Usable supply coverage

Can accessible supply at this exact stage and specification cover scenario demand?

Driver / moduleCR-D1|CR-D2|CR-D3 · stage_availability
Unit / directionratio · higher_better
Graph rolerequired_dependency
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Verified usable U.S. output plus verified-accessible allied output plus releasable qualified inventory, divided by demand in the same stage, specification, geography, scenario, and horizon.

Condition bucket rule

resilient >=1.25; adequate 1.00-1.249; thin 0.75-0.999; exposed 0.50-0.749; acute <0.50; unscored if denominator is not defensible

Comparison and limitation

Compute separately for the PRC and U.S./verified allies. Do not compare if demand definitions differ materially; show low/base/high demand cases.

CR-M02PRC-controlled stage share

How much actual world output at the relevant stage is produced or operationally controlled by PRC entities?

Driver / moduleCR-D1|CR-D2|CR-D3 · stage_concentration
Unit / directionpercent · lower_better_for_us_resilience
Graph rolebottleneck
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

PRC-controlled actual output divided by world actual output for the exact material form and stage; ownership and facility location are retained separately.

Condition bucket rule

resilient <10%; adequate 10-24.9%; thin 25-49.9%; exposed 50-74.9%; acute >=75%

Comparison and limitation

This is an absolute U.S.-exposure condition, not a symmetric actor score. Report location-only and control-adjusted shares when they differ.

CR-M03Country production HHI

Is output diversified across countries at this exact stage?

Driver / moduleCR-D1|CR-D2|CR-D3 · stage_concentration
Unit / directionindex_0_to_1 · lower_better
Graph roleredundancy
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Sum of squared country shares of actual output, using fractional shares from 0 to 1.

Condition bucket rule

resilient <0.15; adequate 0.15-0.249; thin 0.25-0.399; exposed 0.40-0.599; acute >=0.60

Comparison and limitation

Calculate separately by mining, intermediate, refining, and qualified-output stage. Country diversity can overstate independence when ownership or feedstock is shared.

CR-M04Net import reliance

How dependent is the actor on net imports for apparent consumption?

Driver / moduleCR-D1|CR-D2|CR-D3 · trade_dependency
Unit / directionpercent · lower_better
Graph rolerequired_dependency
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Net imports divided by apparent consumption, following the source commodity definition; retain negative values for net exporters but cap only for display.

Condition bucket rule

resilient <10%; adequate 10-24.9%; thin 25-49.9%; exposed 50-74.9%; acute >=75%

Comparison and limitation

Use only with matching material forms. Transshipment, embodied imports, grades, and stock changes can break symmetry between U.S. and PRC estimates.

CR-M05Independent qualified source count

How many genuinely independent sources can deliver the required grade and quantity in the horizon?

Driver / moduleCR-D1|CR-D2|CR-D3 · source_diversity
Unit / directioncount · higher_better
Graph roleredundancy
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Count sources with verified output, defense qualification where required, accessible logistics, and no shared controlling owner, sole feedstock, facility, or inaccessible jurisdiction.

Condition bucket rule

resilient >=4 sources across >=3 credible jurisdictions; adequate 3 across >=2; thin 2 across >=2; exposed 1; acute 0

Comparison and limitation

Apply to the same specification and demand. Nominal companies sharing a plant or upstream choke point count as one failure mode.

CR-M06Verified output versus announced capacity

Is claimed capacity producing saleable material at the required stage and grade?

Driver / moduleCR-D1|CR-D2|CR-D3 · delivered_output
Unit / directionpercent · context_dependent
Graph roleoutcome_link
Assessment scopecurrent state
Threshold provenancetrend_only
Statusapplied_current_v1
Definition or formula

Actual verified saleable output divided by announced or nameplate capacity for the same facility, period, form, and grade.

Condition bucket rule

No universal condition bucket. Display actual output, nameplate capacity, utilization, feedstock constraint, and confidence separately.

Comparison and limitation

High utilization can mean delivered output but little surge headroom; low utilization can mean headroom or a nonfunctional plant. It is diagnostic, not a stand-alone advantage score.

CR-M07Byproduct or co-product dependence

How much supply depends on the economics and output of another host commodity?

Driver / moduleCR-D1|CR-D2 · resource_coupling
Unit / directionpercent · lower_better_all_else_equal
Graph rolebottleneck
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Share of relevant output recovered as a byproduct or co-product, plus identification and concentration of host commodities.

Condition bucket rule

resilient <10%; adequate 10-24.9%; thin 25-49.9%; exposed 50-74.9%; acute >=75%

Comparison and limitation

A high share is not automatically bad if hosts are diverse and scalable. Use as exposure evidence and test host-market sensitivity before it can constrain a driver.

CR-M08Defense qualification status

Can the source's product legally and technically enter the priority mission-system production line?

Driver / moduleCR-D3 · qualification
Unit / directionordinal · higher_better
Graph rolerequired_dependency
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Highest verified status for the exact source, material, process, specification, component, and use.

Condition bucket rule

resilient production-qualified with sustained accepted lots; adequate qualified with limited-rate accepted output; thin qualification testing under way with representative output; exposed lab or pilot demonstration only; acute no viable qualified source or failed qualification

Comparison and limitation

Do not transfer qualification across grades, facilities, process changes, or mission uses without evidence. PRC military qualification may require bounded inference.

CR-M09Second-source qualification lead time

How long would it take to qualify an alternate source after a disruption?

Driver / moduleCR-D3 · qualification
Unit / directiondays · lower_better
Graph rolesubstitute
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Elapsed calendar time from authorized start with a viable source to production qualification and accepted deliverable output.

Condition bucket rule

resilient <=30 days; adequate 31-180; thin 181-365; exposed 366-1825; acute >1825 or no viable source

Comparison and limitation

Estimate ranges and identify redesign, test, certification, tooling, and security approvals. Announced sourcing agreements are not qualification.

CR-M10Priority-system country-of-origin coverage

Can the analyst trace critical inputs to source countries through relevant supplier tiers?

Driver / moduleCR-D4 · visibility
Unit / directionpercent · higher_better
Graph roleconfidence_only
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Priority-system critical line items with verified country of origin through the designated critical tier, divided by all designated critical line items.

Condition bucket rule

resilient >=95%; adequate 85-94.9%; thin 70-84.9%; exposed 50-69.9%; acute <50%

Comparison and limitation

This conditions confidence and reveals exposure; it is not physical capacity. Supplier self-attestation and unknown origin remain separate categories.

CR-M11Adversary sole-source exposure

What share of priority dependencies has one qualified source under PRC control and no usable buffer?

Driver / moduleCR-D4 · single_point_exposure
Unit / directionpercent · lower_better
Graph rolebottleneck
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Priority material-component dependencies with exactly one qualified PRC-controlled source and less than 30 days of usable coverage, divided by all mapped priority dependencies.

Condition bucket rule

resilient 0%; adequate >0-5%; thin >5-15%; exposed >15-30%; acute >30%; unscored when CR-M21 mapping coverage is below 85%

Comparison and limitation

Requires a defined dependency universe and verified buffer denominator. Unknown-source dependencies are reported separately and cannot be presumed safe.

CR-M12Shared choke-point breadth

How many priority mission systems depend on the same non-substitutable source, facility, route, feedstock, tool, or process?

Driver / moduleCR-D4 · shared_chokepoints
Unit / directionsystem_count · lower_better
Graph rolebottleneck
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Count distinct priority mission systems with a required dependency on the same failure node within the horizon.

Condition bucket rule

resilient 0 affected systems; adequate 1; thin 2-3; exposed 4-6; acute >=7

Comparison and limitation

Thresholds are initial triage only and require calibration to the size of the mission-system universe. Record consequence and demand, not count alone.

CR-M13Usable inventory coverage

How long can qualified, accessible inventory meet scenario demand after supply stops?

Driver / moduleCR-D5 · inventory
Unit / directiondays · higher_better
Graph rolesubstitute
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Verified releasable inventory at the required grade and location, divided by average daily scenario demand including loss and yield assumptions.

Condition bucket rule

resilient >=365 days; adequate 180-364; thin 90-179; exposed 30-89; acute <30; unscored if inventory or demand is unavailable

Comparison and limitation

DLA transaction plans are not inventory levels. Commercial inventories and classified war reserve stocks require explicit coverage and confidence labels.

CR-M14Qualified second-source coverage

What share of priority dependencies has a genuinely independent qualified alternate able to deliver in the horizon?

Driver / moduleCR-D5 · second_sourcing
Unit / directionpercent · higher_better
Graph roleredundancy
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Priority dependencies with at least one independent qualified and accessible alternate meeting required quantity, divided by all mapped priority dependencies.

Condition bucket rule

resilient >=95%; adequate 85-94.9%; thin 70-84.9%; exposed 50-69.9%; acute <50%; unscored when CR-M21 mapping coverage is below 85%

Comparison and limitation

Measure by horizon and quantity; a paper alternate or one dependent on the same feedstock is not an independent second source.

CR-M15Substitute readiness

Can an alternate material or design replace the constrained input without unacceptable mission loss?

Driver / moduleCR-D5 · substitution
Unit / directionordinal · higher_better
Graph rolesubstitute
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Highest demonstrated readiness of a substitute for the exact mission use, including qualification, performance penalty, production scale, and redesign burden.

Condition bucket rule

resilient drop-in qualified and scaled; adequate qualified with manageable performance or quantity limit; thin representative demonstration with qualification plan; exposed laboratory option or major redesign; acute no viable substitute

Comparison and limitation

Record mass, thermal, reliability, signature, cost, schedule, and mission-performance penalties. A scientific possibility is not an operational substitute.

CR-M16Qualified secondary-supply coverage

How much scenario demand can verified recycled or recovered material meet at the required grade?

Driver / moduleCR-D5 · recycling
Unit / directionratio · higher_better
Graph roleparallel_contributor
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Qualified secondary output available to the actor in the horizon, divided by demand for the same material form and specification.

Condition bucket rule

resilient >=1.25; adequate 1.00-1.249; thin 0.75-0.999; exposed 0.50-0.749; acute <0.50; unscored without a denominator

Comparison and limitation

Do not use gross collection or theoretical recoverability. Account for scrap availability, yield, contamination, energy, and qualification.

CR-M17Project delivery credibility

How much evidence supports a project's ability to deliver qualified output by the horizon?

Driver / moduleCR-D6 · project_pipeline
Unit / directionordinal · higher_better
Graph roleenabler
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Highest verified maturity for a named project, retaining finance, permits, construction, feedstock, workforce, commissioning, and qualification as separate milestones.

Condition bucket rule

resilient sustained qualified output; adequate commissioning with secured inputs and qualification on schedule; thin construction with finance and core permits secured; exposed definitive feasibility with material milestones open; acute announcement, exploration, or no credible delivery path

Comparison and limitation

Maturity does not measure quantity. Capacity enters a horizon scenario only with a separate output estimate and schedule range.

CR-M18Disruption recovery time

How quickly can a failed critical stage restore accepted output?

Driver / moduleCR-D6 · recovery
Unit / directiondays · lower_better
Graph roleoutcome_link
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Calendar time from disruption to sustained accepted output at the scenario-required rate, including repair, workforce, feedstock, restart, and requalification.

Condition bucket rule

resilient <=30 days; adequate 31-180; thin 181-365; exposed 366-1825; acute >1825 or nonrecoverable

Comparison and limitation

Use exercise, outage, restart, or audited schedule evidence where available; otherwise show a range and identify untested assumptions.

CR-M19Time to new qualified output

How long until a new source delivers accepted output rather than announced capacity?

Driver / moduleCR-D6 · capacity_expansion
Unit / directiondays · lower_better
Graph roleoutcome_link
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Calendar time from assessment date to sustained qualified output, including permitting, finance, construction, commissioning, process stabilization, and qualification.

Condition bucket rule

resilient <=365 days; adequate 366-730; thin 731-1095; exposed 1096-1825; acute >1825 or no credible path

Comparison and limitation

Report schedule confidence and milestone slippage. Budget authority and awards are leading indicators only.

CR-M20Allied access status

May allied output actually be credited to the U.S.-allied base case in this scenario and horizon?

Driver / moduleCR-D1|CR-D2|CR-D3|CR-D5 · allied_access
Unit / directioncategorical · eligibility_not_score
Graph rolesubstitute
Assessment scopecurrent state
Threshold provenanceontology_rule
Statusapplied_current_v1
Definition or formula

Categorical eligibility based on legal authority, exportability, qualification, allocation, logistics, and timing: verified_accessible; horizon_feasible; nominal; unavailable.

Condition bucket rule

No condition bucket. Verified accessible enters the base case; horizon feasible enters only the named milestone case; nominal is displayed without credit; unavailable is excluded.

Comparison and limitation

Apply to actual spare or allocated output, not total allied production. Preserve national owner and destination commitments to prevent double counting.

CR-M21Critical-dependency mapping coverage

How much of the declared priority dependency universe has a complete, source-backed stage map?

Driver / moduleCR-D4 · visibility
Unit / directionpercent · higher_better
Graph roleconfidence_only
Assessment scopecurrent state
Threshold provenanceprovisional_analysis
Statusapplied_current_v1
Definition or formula

Mapped dependencies with material, stage, specification, supplier, ownership, country, qualification, and mission-use fields complete, divided by all declared priority dependencies.

Condition bucket rule

resilient >=95%; adequate 85-94.9%; thin 70-84.9%; exposed 50-69.9%; acute <50%

Comparison and limitation

Never treat unmapped dependencies as non-PRC or resilient. This metric governs assessment confidence, not advantage by itself.

Known limitations

Unknown means unknown.

  • Most commodity values are 2025 estimates published in 2026; they do not measure classified wartime demand.
  • National production does not establish ownership, spare output, defense qualification, or U.S. access.
  • PRC inventory, military allocation, utilization, and lower-tier supplier data are often unavailable or unverifiable.
  • National Defense Stockpile annual plans show potential transactions, not holdings or days of coverage.
  • A current project, award, or announced capacity is displayed as mitigation but never counted as sustained accepted output.
  • The ten pathways are a consequence-selected first cut, not a claim that the remaining federal minerals are unimportant.
Public evidence

22 critical-resources source records.

CR-S01 · T2Final 2025 List of Critical Minerals

Primary use: Authoritative 60-mineral universe; official byproduct/co-product table; statutory and interagency basis

Known limitation: Broader economic and national-security list rather than a defense mission-priority list; notice is not stage-level defense demand data

Open public source ↗
CR-S02 · T2Methodology and technical input for the 2025 U.S. List of Critical Minerals—Assessing the potential effects of mineral commodity supply chain disruptions on the U.S. economy

Primary use: Economic disruption scenarios; probability weighting; single-point-of-failure basis; federal prioritization trace

Known limitation: Economic and industrial scope does not resolve defense mission dependencies; model assumptions and source-year lags must be retained

Open public source ↗
CR-S03 · T2Mineral Commodity Summaries 2026

Primary use: Production; capacity where available; reserves/resources; import reliance; import sources; recycling; substitutes; stockpile and program context

Known limitation: Commodity-level annual estimates; defense grade, ownership, facility utilization, and mission demand often absent

Open public source ↗
CR-S04 · T1Mineral Commodity Summaries 2026 data release

Primary use: Machine-readable commodity observations and reproducible ingestion

Known limitation: Inherits MCS definitions and gaps; schema does not establish defense qualification or access

Open public source ↗
CR-S05 · T2Mineral Supply Chain Analysis

Primary use: Supply-chain stage concepts; project and commodity analyses; disruption/recovery research

Known limitation: Coverage and cadence differ by commodity; program page is an index rather than a single comparable dataset

Open public source ↗
CR-S06 · T2World Minerals Outlook—Cobalt, gallium, helium, lithium, magnesium, palladium, platinum, and titanium through 2029

Primary use: Project maturity; country capacity; 2025-2029 supply outlook; separation of credible projects from early announcements

Known limitation: Eight commodities only; capacity is not actual output; forecasts and schedules require later validation

Open public source ↗
CR-S07 · T1The mineral industries of China—Facility and production data

Primary use: PRC mine and processing facility locations; capacity/production context; stage concentration

Known limitation: Public and translated source gaps; ownership, utilization, defense allocation, and current status can be uncertain

Open public source ↗
CR-S08 · T2Global Critical Minerals Outlook 2026

Primary use: Demand/supply outlook; refining concentration; project and policy context

Known limitation: Energy-transition focus does not map directly to defense specifications or demand; some underlying inputs are modeled or commercial

Open public source ↗
CR-S09 · T1Australia's Identified Mineral Resources 2025

Primary use: Allied resources, reserves, production, projects, and national baselines

Known limitation: National potential is not evidence of U.S. legal access, spare output, export allocation, transport, or defense qualification

Open public source ↗
CR-S10 · T1DataWeb and DataWeb Query API

Primary use: HTS-level value and quantity by partner; monthly trade trends; reproducible queries

Known limitation: Account/API key required; HS codes can mix forms and grades; origin, transshipment, embodied content, and defense use may be unclear

Open public source ↗
CR-S11 · T2Annual Materials Plan archive

Primary use: Maximum planned acquisitions and disposals; visible stockpile program actions

Known limitation: Not total holdings, release plan, classified inventory, demand, or days of coverage; planned action may not execute

Open public source ↗
CR-S12 · T2Defense Industrial Base: Actions Needed to Address Risks Posed by Dependence on Foreign Suppliers

Primary use: Tier-n visibility; country-of-origin limitations; scope of DoD supplier network; governance gaps

Known limitation: Does not provide a complete bill of materials or quantify all dependencies; findings reflect reviewed systems and data

Open public source ↗
CR-S13 · T2Critical Minerals: Reducing U.S. Import Reliance with Substitution and Recycling Technologies

Primary use: Substitution and recycling readiness; technical and adoption barriers; public mitigation evidence

Known limitation: Selected technologies and cases; research activity is not qualification or scaled defense output

Open public source ↗
CR-S14 · T2Defense Production Act Purchases budget exhibit, FY2026 President's Budget

Primary use: Funding intent; project names; mining, processing, microelectronics, magnets, energetics, tooling, and industrial-base interventions

Known limitation: Budget authority, request, obligation, and award are not commissioned capacity or accepted output; schedules can change

Open public source ↗
CR-S15 · T1USAspending API

Primary use: Awards, obligations, recipients, place of performance, and transaction history

Known limitation: Award descriptions and industry codes do not establish physical milestones, qualification, ownership depth, or delivered output

Open public source ↗
CR-S16 · T2Manufacturing and Energy Supply Chains programs and FCAB publications

Primary use: Battery materials, cells, manufacturing projects, awards, strategies, and technical roadmaps

Known limitation: Plans and awards are enablers; defense-specific grades, allocation, qualification, and output need independent verification

Open public source ↗
CR-S17 · T2Solid Rocket Motors: DOD and Industry Are Addressing Challenges to Minimize Supply Concerns

Primary use: Historical evidence on solid-rocket-motor ingredients, qualification, supplier concentration, disruption, and workforce failure modes

Known limitation: Older evidence; supplier structure, programs, and corrective actions may have changed and require current corroboration

Open public source ↗
CR-S18 · T2Critical Materials: Action Needed to Implement Requirements That Reduce Supply Chain Risks

Primary use: Defense uses, stockpile governance, procurement restrictions, and known dependence on China for rare earths and other critical materials

Known limitation: Does not disclose stockpile holdings, defense demand, program-level dependencies, or current qualified output

Open public source ↗
CR-S19 · T2DOD Looks to Establish Mine-to-Magnet Supply Chain for Rare Earth Materials

Primary use: Defense mission uses; mine-to-magnet stages; qualified domestic magnet production; named awards and operating capabilities

Known limitation: Some capacity statements were projections when published and require later operating evidence; defense demand coverage is not disclosed

Open public source ↗
CR-S20 · T2MP Materials 2025 Form 10-K

Primary use: Actual NdPr oxide output; commissioned metal and alloy steps; start of commercial-equipment NdFeB manufacturing; customer and feedstock disclosures

Known limitation: Company-specific filing; projected capacity is not accepted defense output and qualification coverage is not disclosed

Open public source ↗
CR-S21 · T2Department of Defense Awards $14.3 Million to Expand Sources of Solid Rocket Motors

Primary use: New solid-rocket-motor source; energetics, casting, curing, quality assurance, assembly, and qualification work

Known limitation: Award and planned expansion do not disclose accepted output, ingredient-source diversity, schedule performance, or demand coverage

Open public source ↗
CR-S22 · T2Department of Defense Awards $6.2 Million to Sustain Critical Production of Tungsten

Primary use: Current tungsten industrial-base intervention and domestic production sustainment

Known limitation: Award value and purpose do not establish mine output, qualification, independent feedstock, or demand coverage

Open public source ↗
Structured current assessment

Reuse the evidence—not just the conclusion.

The JSON contains the executive judgments, drivers, pathways, actions, and limitations. CSV files expose every applied observation, metric rule, mineral trace, and source record.

Assessment boundary

The old call is now substantiated—not silently overwritten.

This analysis applies the deeper method and reaches the same current overall PRC-lead judgment with far more traceability. The stable ten-category assessment API and four-driver capability record remain unchanged as a separate core contract. Compare the core capability page →